[ad_1]
Prime Minister Narendra Modi on Monday inaugurated the primary ever undersea optical fibre challenge for Andaman and Nicobar Islands which can present excessive pace broadband connections within the Union Territory at par with companies within the mainland.
On December 30, 2018, the Prime Minister had laid the muse for the two,312-Kilometers lengthy submarine optical fibre cable challenge connecting Chennai – Andaman and Nicobar Islands (CANI).
“From Chennai to Port Blair, Port Blair to Little Andaman and Port Blair to Swaraj Dweep, this service has started in large part of Andaman Nicobar from today,” Modi stated after inaugurating the challenge.
Inauguration of the submarine Optical Fibre Cable in Andaman and Nicobar Islands ensures:
High-speed broadband connectivity.
Fast and dependable cell and landline telecom companies.
Big enhance to the native financial system.
Delivery of e-governance, telemedicine, and tele-education. pic.twitter.com/GWGFUGFMw1
— PIB India (@PIB_India) August 10, 2020
The challenge has been carried out at a price of Rs 1,224 crore.
Besides, Port Blair, it should join different islands specifically Swaraj Dweep (Havlock), Long Island, Rangat, Little Andaman, Kamorta, Car Nicobar, and Greater Nicobar.
PM stated that it’s the accountability of the nation to offer trendy telecom connectivity to the individuals of Andaman and Nicobar Islands.
All telecom operators within the nation will have the ability to present their cell and broadband companies utilizing the CANI optical fibre hyperlink.
“The optical fibre connectivity project to connect Andaman and Nicobar with the rest of the country and the world is a symbol of our commitment towards ease of living,” Modi stated.
According to official information, Internet with pace of 400 gigabyte (GB) per second might be offered at Port Blair and for different islands it is going to be 200 GB per second.
Undersea cable linking Andaman Islands with Chennai was laid earlier than time, Modi stated whereas inaugurating the cable hyperlink.
Work of laying undersea cable has been executed by BSNL in a document time of lower than 24 months.
This challenge will fortify 4G cell companies and digital companies like tele-education, tele-health, e-governance companies, and tourism on the islands.
[ad_2]
Source